Town of Duck Fee Schedule effective July 1, 2007

 

Town of Duck Fee Schedule

Effective July 1, 2003

Revised November 6, 2003

Revised July 1, 2005

 

IT IS THE POLICY OF THE TOWN THAT SUBMITTED FEES

SHALL NOT BE REFUNDED.

 

 

Section I Building Permit Fees for New Construction/Additions/Renovations & Remodeling**:

 

Residential new construction and additions                                $0.55/sq. ft. heated space

(Including attached decks, garages and utility rooms)                 $0.25/sq. ft. unheated space

 

Renovations/Remodels                                                             $0.40/sq. ft. heated space

                                   

Storage Buildings <12’ any dimension                                       No building permit required, but Land Disturbance Permit required (see fee below)

 

 

Multifamily, Condominiums, Hotels/Motels                                $0.75/sq. ft. heated

                                                                                                $0.40/sq. ft. unheated

Renovations/Remodels                                                             $0.55/sq. ft. heated space

 

 

Commercial new construction and additions                              $0.75/sq. ft. heated space

                                                                                                $0.40/sq. ft. unheated

Renovations/Remodels                                                              $0.55/sq. ft. heated space

 

Signs                                                                                        $50.00  +  Sign Permit fees

                                                                                               

 

Section II Five (5) Building Permit system.

 

A.     There shall be a five (5) permit system with separate permits issued for:

 

Building Permit

Electrical Permit                                                                 

Plumbing Permit                                                                 

Mechanical Permit

Gas Permit

 

B.     When a building permit is issued there will be no charge for associated electrical, plumbing or mechanical permits as outlined above in Section II (A) above.

 

C.  Above & Below ground propane tanks are not subject to Section II (B) above and may require additional permits.

                                                                                                                         

Section III Other fees, not covered in sections above:

 

1. Mobile Homes                                                                      Single-wide $250.00

                                                                                                Double-wide $275.00

                                                                                                Triple-wide $300.00

     Poured footing inspection for mobile home                            $40.00

 

2. Temporary Construction Trailer                                            $50.00 flat fee

 

3. Temporary Tent >900 square feet                                         $50.00 flat fee

    ( >240 sq. ft. requires Flammability certificate)

 

4. House Moving (into or within Town)                                                

    (fees do not include any necessary

     building or trade permits & additional

     fees for escort may apply)

     Moving into Town in AEC zone                                           $1,000.00

     Moving into Town of Duck                                                  $750.00

     Moving within the Town of Duck                                         $500.00

     Moving on the same lot                                                        $250.00

     Moving out of Town of Duck                                               $100.00

 

5. Swimming Pools, Spas,                                                         $250.00 flat fee

     Hot Tubs & Tennis Courts                                                 

 

6. Residential detached storage buildings, utility buildings,    

    carports and workshops (accessory buildings 80 sq.ft. or

    Less--No building permit required

   but Land Disturbance Permit required)                                      $100.00 flat fee

 

7. Gas Pumps                                                                           $100.00 per pump

 

8. Structural Demolition                                                           

    (Asbestos Report required if commercial or ever used as commercial)

 

    Residential demolition in AEC zone                                        $250.00

    Residential demolition not in AEC Zone                                 $150.00

    Non-Residential demolition in AEC zone                               $500.00

    Non-Residential demolition not in AEC zone                         $300.00

 

9. Fuel Tanks   Above Ground: 0-5,000 gallons                        $200.00

                        Above Ground: Above 5,000 gallons                $300.00

                        Underground: 0-5,000 gallons                          $250.00

                        Underground: Above 5,000 gallons                   $350.00

 

10. Bulkheads & Retaining Walls

      requiring a building permit up to 50 Ft.                                $1.00 per lineal ft. ($100 minimum)

      Each additional foot over 50 feet                                         $0.50 per lineal ft.

 

      Piers                                                                                   $0.50 per sq. ft.  ($100 minimum)

 

11. Flood Development Permit                                                 $50.00

         (in addition to other applicable

          building permit fees)

 

12. Re-Inspection Fee                                                              $50.00 first re-inspection                     

$50.00 increase for each subsequent re-inspection for the same item

      Inspections not otherwise listed                                           $30.00

 

13. Occupancy Permit                                                              $25.00

            Temporary Residential                                                  $125.00

            Temporary Commercial                                                $200.00

 

14. Communication Tower/Water Tank                                    $10.00/vertical foot

 

**Minimum building permit fee is $100.00

 

Work without a permit- A fee double the amount of the required permit will be charged for any permit acquired after work has been started or completed.

 

Construction must begin within 6 months or permits will expire.

 

Penalty for failing to call for inspections 50% of original permit cost.

 

Permit renewal fee (must be renewed within 30 days of expiration) $100.00

 

Section IV Electrical Permit fees for repairs/replacement/extension of service:

 

Temporary Service Pole                                                           $30.00 flat fee

 

Conditional Power Residential                                                  $250.00

Conditional Power Commercial                                                $250.00

 

Minimum permit fee                                                                  $50.00 plus following:

 

            Service change or additional service                              $0.25 per amp

 

            Receptacles, lights, switches and outlets as follows:

 

0-49                                                                 $30.00

50-above                                                          $45.00

Dryer                                                                $5.00

Baseboard heat per unit                                     $3.00

Miscellaneous                                                   $5.00

 

Section V Plumbing permit for repairs/replacement/extension of service:

 

Minimum fee                                                                             $50.00 plus $10.00 per fixture

 

Section VI Mechanical permit for repairs/replacement/extension of service:

 

Minimum permit fee                                                                  $50.00 plus following:

            Change Air handling unit                                               $30.00

            Change Heat Pump                                                       $30.00

            Change boiler                                                               $40.00

 

Section VII Gas permit for repairs/replacement/extension of service:

 

Minimum permit fee                                                                  $50.00 plus $20.00 per appliance

 

 

Section VIII Development and Site Plan Review Fees:

 

1.  Single family dwellings                                                          $100.00 per dwelling unit

            Additions/modifications to existing dwellings                  $50.00 per unit

 

2.  Multi family dwellings, duplexes, 

Condominiums, Townhouses, apartment                        $125.00 per dwelling unit

dwellings

 

3. Motels/hotels                                                                        $25.00 per unit

 

4. Commercial parking lots, commercial,

business and Multi-family accessory

parking areas (other than single

family residence).  Note that this fee

is in addition to other required

review fees for the same project)                                          $15.00 per space

 

5. All other new development not included elsewhere

    in fee schedule (this fee is based on footprint of

    proposed development or structure and is in

    addition to review fees for associated

    parking areas.)                                                                      $0.25 per square foot

 

6.   Lots in a subdivision                                                            $75.00 per lot

 

 Section IX Other Planning and Zoning Review and Application Fees:

 

1.   Text amendment to the Zoning Ordinance                             $200.00

 

2.   Rezoning (zoning text/map amendment)                                 $500.00  (plus $300/acre or any fraction thereof beyond one acre)

 

3.   Change of Use Permit if no site plan change is

       required                                                                             $100.00

 

4.   Change of Use Permit requiring submittal of a new

       site plan                                                                             $150.00

 

            5.   Conditional Use/Special Exception Permit               $200.00

 

            6.   Conditional Use Permit for home occupation           $100.00

 

            7.   Board of Adjustment Variance request                    $300.00

 

8.   Group Development Application Fee                                  $300.00

 

            9.   Group Development amendment fee                       $150.00

 

            10.   Exempt Plat review fees                                        $100.00

 

11. Notification to adjacent property owners

Of site plan reviews by certified mail.                                $10.00 each

 

12.  Board of Adjustment Appeal                                             $250.00

 

13. Zoning Compliance Certificate/Review Letter                      $250.00

 

14. Fire Marshall Inspections for Commercial Occupancy Permits

 

            New Building Shell                                                       $60.00

            Completed space > 500 square feet                  $30.00

            Completed space 501-5000 square feet            $60.00

            Completed space >5,000 square feet                $100.00

 

15. Consolidated Sign Permit                                                    $150.00 up to 64 sq. ft.

                                                                                                $250.00 > 64 sq. ft.

      Amendments to Consolidated Sign Permit                           $50.00 per sign

 

      Temporary Sign Permit                                                       $10.00 per 10 day period

             + $25.00 deposit

 

     Community/Association Sign Permit                                     Fee Waived but Application still required and Building permit may also be necessary

 

16. Signs removed from public rights of way or within

      30’ of centerline of public roads and picked up by

      owner within 10 days—note after 10 days signs will

      be discarded                                                                       $10.00 per sign

 

17. Administrative approvals/reviews                                         $100.00

            not otherwise listed

 

18.  Special Planning Board or Town Council Meeting

       requested by Applicant                                                      $800.00

 

19. CAMA Minor Permit                                                         $100.00

 

20. All other uses/minimum application fee                                 $100.00

 

21. Land Disturbance Permit (w/o an approved

      building permit)                                                                   $100.00

 

22. Fire/Burglar Alarm Permit                                                   $50.00

           (new/reinstatement)

 

      False Alarm Fees

      First                                                                                    No charge

      Second                                                                               $25.00

      Third                                                                                  $50.00

      Fourth                                                                                 $100.00 and permit revocation

 

23.  HOA Recovery Fund Fee                                                  $10.00

 

Resubmittal of expired site plan approvals

Site plan approvals expire 24 months after the date of

approval. After the expiration date of an approved site

plan a charge of 50% of initial review fee shall be paid

for a re-submittal when the following conditions are met:

a.       A review fee has been paid

b.      Site plan approval has expired

c.       No changes are being proposed in the re-submitted site plan

              

Note that fees/permits/approvals may also be required for construction projects from other local, state, and federal agencies.  Examples:           

--Water connection or review fees, health department fees, recordation fees by Dare County

--Wetlands permitting, U.S. Army Corps of Engineers

--Right-of-way review/dedication, North Carolina Department of Transportation

--Major CAMA permits, North Carolina Coastal Resources Commission

 

 

  

Section X Administrative and Miscellaneous Charges:

 

1. Re-hearing/advertising                                                           $100.00

            (at Petitioner/Applicant’s request)

 

2. Copy of Agenda Package                                                     $10.00

 

3. Copy of Zoning Ordinance                                                    $20.00

            Annual Supplement Service                                           $15.00 per year

 

4. Copy of Land Use Plan                                                        $20.00

 

5. Copy of Budget Document                                                   $25.00

 

6. Copies of Requested Documents

            8 ˝ x 11, 11 x14 & 11 x17

                        (after the 5th sheet)                                            $.25 black & white per page

                        (after the 3rd sheet)                                            $.30 color per page

 

The Town Manager may consider fee waivers and reductions for charitable organizations.